Biomass Fired Wastewater Evaporator
Energy-Efficient. Eco-Friendly. Cost-Saving Evaporation Technology.
Our Biomass Fired Wastewater Evaporator offers a highly economical and sustainable way to reduce wastewater volumes using biomass pellets as the heat source. Designed for industries looking to minimize fuel costs and move toward greener operations, this system delivers powerful thermal evaporation with significantly lower operating expenses compared to oil or gas-fired models.
Capacity Available :- 500 LPH to 5000+ LPH, depending on the model.
Working :
- Wastewater is pumped from the storage tank to the evaporator chamber.Automatic high-level and low-level sensors maintain precise water levels for safe operation.
- A high-efficiency biomass pellet burner generates hot flue gases.These gases pass through the heat exchanger tubes, transferring heat to the wastewater efficiently.
- As the wastewater heats up, water begins to evaporate.The generated vapor exits through the vent stack, ensuring continuous evaporation.
- After evaporation, concentrated sludge remains at the bottom.It can be removed through the top inspection door or drained using the sludge drain valve.
- Temperature monitoring
- Water level sensors
- Proper flue gas pathways
- Optional blower system for improved draft.
Features :
Why Biomass Fuel? :
- Fuel cost is 60–70% lower than diesel/LDO/LPG
- Environmentally friendly – carbon-neutral fuel.
- Easy fuel availability.
- Low running cost, especially for medium & high capacities.
- Suitable for industries with long daily operating hours.
Applications :
- RO reject water
- Plating & phosphating wastewater
- Coolant and cutting fluid
- Chemical & pharma effluent
- High-TDS, high-load industrial wastewater
Technical Specifications
| Description | Details |
|---|---|
| Name | Thermal Waste Water Evaporator |
| Operation | Automatic |
| Available Evaporation Rate | 500 LPH to 5000 LPH |
| Heat Sources | Biomass Pellets |
| Burner | Biomass Operated Fintek Make Burner. |
| Power Requirement | Single Phase / Three Phase |
| Inner Tank Construction | SS 304/316 -corrosion-resistant |
| Heat Exchanger Construction | SS 304/316 -corrosion-resistant |
| Tank Cover Construction | MS Powder Coated |
| Insulation | Cerawool 25mm |
| Vent Stack | 400 mm Length 500 mm. |
| PLC Control Panel With HMI | Fintek Make Electrical Panel |
| Sensors | Temperature Sensor & Level Sensor |
| Feed Pump | Standard make |
| Inlet Port,Piping's, Drain Port, Top Inspection Door. | Available |
| Working Hours | Up to 20 hrs. |
